Foundation & footing excavation
Digs cut to plan for footings and foundations — clean walls, correct depth, ready for forms.
Foundation digs, footings, utility trenching, and mass excavation — tight clearances, safe spoil management, and a clean handoff every time.
WHAT'S INCLUDED
From the first bucket of dirt to the last trench backfilled, excavation sets up every trade that follows. Here's what's in scope.
Digs cut to plan for footings and foundations — clean walls, correct depth, ready for forms.
Water, sewer, storm, and dry-utility trenches cut to grade and backfilled to spec.
Bulk earth removal for basements, retention ponds, and large-footprint commercial pads.
Excess material hauled off-site or stockpiled on-site — whichever keeps your schedule and budget intact.
Sloping, shoring, and trench boxes per OSHA requirements — every crew goes home the way they came.
Digging next to existing structures, utilities, and property lines without a damage claim.
30–45 minutes on the ground, an itemized quote within five business days.
Start with a free site walk →HOW IT WORKS
Every excavation project goes through the same process — from first call to final walk.
We look, we listen, we measure the job in front of us. No charge.
Itemized scope and timeline within five business days — not five rounds of phone tag.
Permits pulled, crew and equipment on-site.
Work verified against plan. Documentation provided. Final walk with you.
EXCAVATION, ANSWERED
The questions we get most from owners and GCs before this kind of job starts.
It depends on soil type, depth, access, and how much spoil has to be hauled versus reused on-site. A residential footing dig and a commercial basement excavation aren't priced the same way. We walk the site first and give you an itemized number — not a phone-quote guess.
A typical residential foundation dig runs a few days; basement and larger commercial excavations can run one to several weeks depending on soil, dewatering needs, and shoring requirements. You get a real schedule in writing after the site walk.
Excavation removes and shapes earth below the surface — footings, trenches, basements. Grading shapes the surface itself — cut-and-fill, pad prep, finish elevations. Most projects need both; we self-perform each. See our Grading page for the surface side of the work.
WHY IT MATTERS
Additional industry benchmarks (regional market data, compliance figures) are being sourced and will be added here.
"This safety record and quality of this work is outstanding. He always stays behind his work. Every time we have an emergency he's there."— Dave Almond, Miller Pipeline
Send us your plans and we'll come walk the site with you — free, within five business days.
Request a quote →